“With the right scaffolding, any dream can become a reality.” – Unknown
This past summer, we completed phase I of the restoration of Maison Steinbuchel, a house on the Kansas List of Historic Places. Reasons we undertook this are outlined in this previous BLOG.
The scale of the roofing restoration project this past summer required more than just a standard ladder setup. Much more. The company we contracted with was expert and knew this project needed a comprehensive scaffolding system that could handle the unique demands of a historic structure.
Looking back, investing in a robust scaffolding structure wasn’t just a safety measure—it turned out to be a surprising success for three major reasons:
Three Safety Keys For Scaffolding
1. Uncompromising Safety for Our Crew
Working on a steep historic roof is inherently high-stakes. Our roof has a 12/12 pitch. The main benefit of installing full scaffolding was giving the roofing team a secure, stable platform.
Instead of fighting gravity on sketchy ladders, or even a less robust scaffolding, the crew had safe, wide walk-arounds at every level. The company providing the scaffold said it was unusual to erect commercial-grade scaffold for a residential project. This is not a typical residence!
Knowing that everyone could move around the perimeter of the house with confidence completely changed the pace and safety of the job. The standards of safety Precision Construction and Roofing set for their crews began with this important step.
2. Heavy-Duty Strength for Slate Transport
As anyone dealing with natural slate roofs knows, the material is exceptionally heavy. Transporting hundreds of pounds of old, weathered slate off the roof—and hauling new slate safely back up—requires serious structural integrity.
The scaffolding we installed was robust and sturdy enough to act as a reliable staging platform. It handled the heavy material loads seamlessly, making the debris removal and material delivery process smooth and efficient.
3. Protecting the House Exterior and 140-Year-Old Stained Glass
Perhaps the most critical victory of this setup was safeguarding the historic fabric of the house itself. With 140-year-old stained glass windows and delicate historic exterior details sitting right in the work zone, any accidental drop or slip could have been devastating.
The scaffolding, along with insulation panels over the windows, created a protective physical barrier and working boundary. This kept equipment and heavy materials safely away from our fragile architectural treasures. Thus preserving our history while we worked on the future.
The Video: Scaffolding In Motion
I know scaffolding is a mundane thing to devote an entire BLOG to, but it was such an important aspect of the success of this project. It took three days to set up and over two days to tear down. Given the month-long duration of the project, this entailed 20% of the time to complete the entire project.
Please comment below or email me at nhcullen@cfaith.com